For EAF & induction furnace steelmakers

Your furnace is quietly melting money.
See exactly where — per tonne, per heat.

The landed price on your scrap invoice is not what that scrap costs you. After yield loss, power and electrodes, every material has a true melting cost — and this tool finds the cheapest charge mix that still respects your metallurgical limits.

  • Runs inside your mix limits
  • Answers in seconds, not meetings
  • Excel in, Excel out
₹1,100
saved per tonne of charge
₹13.20 Cr
projected annual saving
10,000 t
charge modelled per month
< 60 sec
to re-optimise after a price change

Illustrative plant: 10,000 t/month across three steel grades, at its own prices and mix limits. Figures are modelled, not a customer case.

Why it matters

The invoice says one thing.
The furnace pays another.

On paper, alloy scrap costs ₹20,000 a tonne MORE than shredded. In the furnace — after yield, power, electrodes and the alloy you recover back — it costs ₹35,000 a tonne LESS. Buy on landed price alone and you charge it last, every single heat.

Without the tool

Buying on landed price

ALLOY SCRAP₹62,000/t “too expensive”
SHREDDED₹42,000/t
  • Yield loss hidden in the slag
  • Extra kWh hidden in the power bill
  • Alloy you already paid for, melted away unpriced

With the tool

Buying on true melting cost

SHREDDED₹43,552/t
ALLOY SCRAP₹8,546/t actually cheapest
  • Every material priced on what it truly costs to melt
  • Power and electrode factors, from your own kWh/t and kg/t
  • Alloy you recover back, credited per tonne
Current mix ₹23,293/t
Optimal mix ₹21,861/t
Same furnace. Same limits. ₹1,432 less per tonne.

How it works

If your team can fill an Excel sheet,
they can run this.

1

Type in your numbers

Your energy price, electrode price and each material's landed cost and yield — the same blue cells your team fills today.

2

Set your limits

Min %, max % and current mix for every material, per steel grade. Your metallurgy stays in charge — the tool never breaks your caps.

3

Read the mix

Pick a grade, get the least-cost charge mix and the saving per tonne, per month and per year. Change a price, get the new answer instantly.

Inside the tool

Built like plant software.
Feels like a good spreadsheet.

True melting cost, per material

What every material really costs your furnace once yield, power, electrodes and recovered alloy are all accounted for.

Least-cost mix engine

The cheapest charge your metallurgy allows — recalculated the moment a price moves. No spreadsheets, no solver to babysit.

Your limits, enforced

Min/max caps per material, per steel grade — with live warnings when a mix can't reach 100%.

Excel in, Excel out

Import the workbook your team already uses. Export a re-importable workbook or a board-ready PDF report.

Your data stays yours

Per-company isolation, role-based access — admins edit, operators view — and the costing engine never leaves the server.

Saved runs

Snapshot every optimisation. Walk into Monday's review with the trend, not an argument.

“Every heat charged without this number is a small, invisible donation to nobody. At ₹1.58 Cr a month on the reference plant, the only expensive thing about this tool is the month you don't use it.”
— Why plants run this before every heat

Access by invitation only

Your scrap prices changed this week.
Did your charge mix?

We set up your company workspace, your materials and your first admin — usually within a day. Email us your company name, furnace type and monthly tonnage:

access@eafoptimiser.com

Multi-company platform · role-based access · your data isolated per company